The original date of the post was adjusted to avoid clutter on Blogspot
Prequalification Invitation
By: Sarir Oil Operations (SOO)
PQ Description Summary
|
Announcement
Starting Date |
05 August 2026 |
|
Announcement
Closing Date |
19 August 2026 CLOSED |
|
Tender
No. |
TC-ENG-005-2026 |
|
Project
Title |
WIP Phase II, Part II, G-19 |
|
Brief
Scope of Work |
Sarir Oil Operations SOO Libya Branch operates oil fields in the WAHAT AND JAKHIRA area to maintain reservoir pressure. The company initiated WIP Phase II “Water Injection Project” in 2014; however, construction was suspended. The Company now intends to complete the remaining construction works associated with WIP Phase II, including the G-Manifold, water-injection flowline, and G-19 wellhead. Contractors shall provide
Procurement, Construction, Pre-Commissioning, Commissioning, and Start-up
Services, together with limited engineering work, for the conversion of the
existing G-19 production well into a water injection well. The scope includes
all required mechanical, piping, electrical, instrumentation, control,
telecommunications, and civil work necessary to complete the remaining
construction and installation activities at the G-Manifold, water injection
flowline, and G-19 wellhead, in accordance with the approved WIP Phase II
design, specifications, drawings, and applicable international standards.
|
|
Submission
of PQ documents via e-mail to: |
Sarir.TenderCommittee@sarir-oil.com |
View Official Announcement:
https://noc.ly/en/tenders/sarir-oil-operations-company-tender-no-tc-eng-005-2026/
No comments:
Post a Comment